What to Expect When Having a Pool Installed

 In Blog
An inground pool surrounded by a lush lawn and trees on a sunny day.

When hiring a contractor to build an inground pool in your backyard, there are many steps involved with the installation process, which will be detailed in this article.

Guide to the Pool Installation Process

Having an in-ground pool installed in your backyard can add a lot to the aesthetic appeal, monetary value and overall enjoyment of your home. When considering the purchase of an inground swimming pool, it’s important to understand just what the pool installation entails in order to make a more informed decision. The following will provide a detailed look at the steps involved with the installation of an inground pool.

Steps Involved With Inground Pool Installation

Having an inground pool installed can be a fairly lengthy process. First, the contractor marks the area where the installation will occur. A large hole will be dug in your yard, which will be followed by the placement of wall panels for the pool outline. This process requires precise measurements to ensure all panels are the exact same height. The plumbing pipes are then laid. Braces are attached to each panel and these braces are filled with concrete to ensure that the pool doesn’t collapse when filled with water. Following this, possible water jets and steps can be added. Sand is placed at the bottom of the pool to make for a smooth and comfortable pool bottom. Foam padding may also be added to the pool walls. The pool liner is then placed and the pool is filled with water. After a few weeks have passed, added accessories such as a diving board, rails and a ladder can be installed.

Selecting the Right Design for Your Pool

Before having the pool installed, it’s essential that you choose a design that is right for you. Whether you want it to be a simplistic oval or wish for something more ornate, the final decision of the design and aesthetic look of the pool is all up to you.

Time it Takes to Install an Inground Pool

In essence, it should take anywhere from 3-7 weeks for the pool installation to be completed, which largely depends on the size of the job and the pool contractor in San Diego that is chosen.